Components:
With
the MOPS program, Atlantic Environmental Systems assists
design and consulting engineers in the application and
permitting of standardized sewage and wastewater pump
stations. Our pump station program, in most cases, is
offered to design engineers on a "no-fee" basis
to assist with the permitting process. The following
list of documents make up the typical pump station engineering
report:
| ·
Letter of Transmittal |
·
Calculation Sheet page 1 |
| ·
Report Cover Page |
·
Calculation Sheet page 2 |
| ·
Table of Contents |
·
Compliance Certification |
| ·
Project Description |
·
Buoyancy Calculation Test |
| ·
MOPS Schedule of Equipment |
·
Project Drawing |
| ·
Pump Performance Curves |
·
Miscellaneous Pump Data |
·
AutoCAD drawing of complete Pump Station |
All
of the MOPS engineering reports are project specific
and comply with all design requirements of the "Recommended
Standards for Wastewater Facilities", by the Great
Lakes-Upper Mississippi River Board of State and Provincial
Public Health and Environmental Managers (1997 Edition),
(a.k.a. Ten States Standards), which most U.S. States
and Territories have adopted.
MOPS
stations are available for a wide range of service conditions
and sizes, from small grinder stations (3-4 feet diameter,
with 12 feet deep wet wells), to large non-clog applications,
(4-8 feet diameter, with 30 feet deep wet wells), both
private and municipal. Our manufactured odorless pump
stations are made with stainless steel components providing
environmentally durable lift stations, and are designed
to comply with the NEC Code for use in a Class 1,
Division 1, Group "D", Hazardous Atmospheres.
Please
fill out our design
inquiry form or e-mail info@emops.com
for more information.
|